Chen, Z.-S., Yang, L.-P., Rodríguez, R.M., Zhu, Z., Pedrycz, W., Skibniewski, M.J.
BIM-aided large-scale group decision support: Optimization of the retrofit strategy for existing buildings
(2022) Applied Soft Computing, 131, art. no. 109790.
DOI: 10.1016/j.asoc.2022.109790
Chen, Z.-S., Zhang, X., Rodríguez, R.M., Pedrycz, W., Martínez, L., Skibniewski, M.J.
Expertise-Structure and Risk-Appetite-Integrated Two-Tiered Collective Opinion Generation Framework for Large-Scale Group Decision Making
(2022) IEEE Transactions on Fuzzy Systems, 30 (12), pp. 5496-5510.
DOI: 10.1109/TFUZZ.2022.3179594
Wu, X., Feng, Z., Chen, H., Qin, Y., Zheng, S., Wang, L., Liu, Y., Skibniewski, M.J.
Intelligent optimization framework of near zero energy consumption building performance based on a hybrid machine learning algorithm
(2022) Renewable and Sustainable Energy Reviews, 167, art. no. 112703.
DOI: 10.1016/j.rser.2022.112703
Yang, Q., Chen, Z.-S., Chan, C.Y.P., Pedrycz, W., Martínez, L., Skibniewski, M.J.
Large-scale group decision-making for prioritizing engineering characteristics in quality function deployment under comparative linguistic environment
(2022) Applied Soft Computing, 127, art. no. 109359.
DOI: 10.1016/j.asoc.2022.109359
Xiong, S.-H., Chen, Z.-S., Chiclana, F., Chin, K.-S., Skibniewski, M.J.
Proportional hesitant 2-tuple linguistic distance measurements and extended VIKOR method: Case study of evaluation and selection of green airport plans
(2022) International Journal of Intelligent Systems, 37 (7), pp. 4113-4162.
DOI: 10.1002/int.22714
Feng, Z., Wu, X., Chen, H., Qin, Y., Zhang, L., Skibniewski, M.J.
An energy performance contracting parameter optimization method based on the response surface method: A case study of a metro in China
(2022) Energy, 248, art. no. 123612, .
DOI: 10.1016/j.energy.2022.123612
Chen, H., Deng, T., Du, T., Chen, B., Skibniewski, M.J., Zhang, L.
An RF and LSSVM–NSGA-II method for the multi-objective optimization of high-performance concrete durability
(2022) Cement and Concrete Composites, 129, art. no. 104446.
DOI: 10.1016/j.cemconcomp.2022.104446
Jethva, S.S., Skibniewski, M.J.
Agile project management for design-build construction projects: a case study
(2022) International Journal of Applied Science and Engineering, 19 (1), art. no. 2020216.
DOI: 10.6703/IJASE.202203_19(1).001
Pan, Y., Zhang, L., Unwin, J., Skibniewski, M.J.
Discovering spatial-temporal patterns via complex networks in investigating COVID-19 pandemic in the United States
(2022) Sustainable Cities and Society, 77, art. no. 103508.
DOI: 10.1016/j.scs.2021.103508
Khoso, A.R., Yusof, A.M., Chen, Z.-S., Skibniewski, M.J., Chin, K.-S., Khahro, S.H., Sohu, S.
Comprehensive analysis of state-of-the-art contractor selection models in construction environment-A critical review and future call
(2022) Socio-Economic Planning Sciences, 79, art. no. 101137.
DOI: 10.1016/j.seps.2021.101137
Chang, J., Chen, Z., Wang, Z., Jin, L., Pedrycz, W., Martinez, L., Skibniewski, M.J.
Assessing the Spatial Synergy Between Integrated Urban Rail Transit System and Urban Form: A BULI-Based MCLSGA Model With Wisdom of Crowds
(2022) IEEE Transactions on Fuzzy Systems, pp. 1-15.
DOI: 10.1109/TFUZZ.2022.3185680
Hu, M., Skibniewski, M.
The impact of the design team characteristics on the sustainable building construction cost: structural equation model analysis
(2022) Architectural Engineering and Design Management, 18 (5), pp. 614-630.
DOI: 10.1080/17452007.2022.2068497
Xiao, L., Chen, Z., Govindan, K., Skibniewski, M.J.
Effects of Online Consumer Reviews on a Dual-Channel Closed-Loop Supply Chain With Trade-In
(2022) IEEE Transactions on Engineering Management, pp. 1-16.
DOI: 10.1109/TEM.2022.3167160
Liu, H., Ju, Q., Zhao, N., Li, H., Skibniewski, M.J.
Value Proposition for Enabling Construction Project Innovation by Applying Building Information Modeling
(2022) Computational Intelligence and Neuroscience, 2022, art. no. 2586307.
DOI: 10.1155/2022/2586307
Xiahou, X., Yuan, J., Xie, H., Skibniewski, M.J., Li, Q.
Exploring driving factors of smart city development under the physical-human society-cyber (P-H-C) space model
(2022) International Journal of Construction Management, 22 (14), pp. 2753-2763.
DOI: 10.1080/15623599.2020.1824601